Skip to content
Book An Appointment

Archives

  • April 2025
  • March 2023

Categories

  • CHARGING
  • ELECTRIC
  • HOME
  • ABOUT
  • SERVICES
    • Electrical Services
    • Car Charger Installation
    • Solar PV Installation
    • Fiber Network Installation
  • BLOG
  • CONTACT
  • Shop
Book An Appointment

April 2025

Dall Engineering > Blog > 2025 > April
“EV charger being installed on a brick wall of a home in Kent.”

OZEV Grant Extension

Apr 5, 2025Comment on OZEV Grant Extension

The UK government’s Office for Zero Emission Vehicles (OZEV) has extended several electric vehicle (EV) chargepoint grant schemes

LEARN MORE

Recent Posts

  • OZEV Grant Extension
  • Car Charger Installation: A Step Toward Convenient and Sustainable Driving
  • Solar PV Installation: Harnessing the Power of the Sun
  • Fiber Network Installation: The Future of High-Speed Connectivity
  • Electric Installation: Powering Homes & Businesses Safely

Recent Comments

No comments to show.

Dall Engineering

We have been in the industry for the past 15 years. Our primary service areas cover all electrical systems, solar system installations, and EV car charger installations.  

OUR SERVICES

  • Electrical Services
  • Car Charger Installation
  • Solar PV Installation
  • Fiber Network Installation

Useful Links

  • Blog
  • Shop
  • Services
  • About Us
  • Contact us
Copyright © 2025 Dall Engineering. Powered by WordPress